July 2008 Financial close was reached on Thursday 31 July 2008 between the State Government and BrisConnections, signalling the green light for construction to commence on the Northern Busway (Windsor to Kedron) and Airport Link projects. View the media releases. May 2008 On Monday 19 May 2008, the Premier, Anna Bligh announced BrisConnections as the preferred consortia to build and construct the Northern Busway between Windsor and Kedron with Airport Link and the Airport Drive Connection. As part of BrisConnections' proposed design, some changes have been made to the Northern Busway concept design (developed during planning). View the Northern Busway change report. View more information on changes to the busway design between Windsor and Kedron. Phone 1800 289 210 northernbusway@transport.qld.gov.au Interpreter 13 14 50 (for people of non-English speaking backgrounds) TTY 13 36 77 (quote 1800 289 210) |